| Real Twin Cities general contracting—basement finishing, attic conversions, custom fireplace surrounds, detached garages, built‑ins and cabinetry, spray‑foam/insulation, and Craftsman‑style trim. Use these examples as inspiration for your project in Minneapolis, St. Paul, Edina, Columbia Heights, and St. Louis Park. |
General contracting ideas and photo gallery in the Twin Cities
Custom Fireplace Surround in Minneapolis Condo
New mantel and fireplace surround with stone/solid‑surface facing, crisp trim profiles, and styled wood storage for a clean condo focal point. 2026 schedule: design 4 weeks; permits 0–2 weeks; build 4 weeks. Estimated cost: $40K.
Detached Garage Build Twin Cities
Cedar‑stained detached garage with new overhead door, gable roof, lighting, and deck access—built to Twin Cities codes for year‑round use. 2026 schedule: design 3–6 weeks; permits 4–8 weeks; build 6–10 weeks. Estimated cost: $90K.
Custom Bookshelf Wall St. Paul
Floor‑to‑ceiling built‑in bookshelves with adjustable shelving and integrated storage; perfect for a reading nook or family room. 2026 schedule: design 2–4 weeks; build 2–4 weeks. Estimated cost: $40K.
Attic Spray Foam and Clean‑Out Minneapolis
Full attic clean‑out, air‑sealing, and spray‑foam insulation at the roof deck to improve comfort and prep for future finishing. 2026 schedule: design 1–2 weeks; permits 0–2 weeks; build 4 weeks. Estimated cost: $60K.
Custom Cabinetry and Tiled Niche Edina
Recessed custom cabinet with warm wood interior, flush white face frame, and tile integration for a clean modern detail. 2026 schedule: design 2–4 weeks; build 2–3 weeks. Estimated cost: $40K.
Finished Attic Suite St. Louis Park
Converted unfinished attic to livable space with new drywall, lighting, HVAC, egress window, and storage—ideal office or bedroom. 2026 schedule: design 3–6 weeks; permits 2–8 weeks; build 6–10 weeks. Estimated cost: $100K.
Finished Basement with New Stair Minneapolis
Basement finish including new stair, rail system, wall panels, and lighting for safe code‑compliant access. 2026 schedule: design 3–6 weeks; permits 2–8 weeks; build 6–10 weeks. Estimated cost: $140K.
Finished Full Basement Family Room St. Paul
Family room with fireplace wall, bathroom, LVP flooring, new doors, trim, and lighting—warm, durable lower‑level living. 2026 schedule: design 3–6 weeks; permits 2–8 weeks; build 6–10 weeks. Estimated cost: $180K.

She Waited 60 Years for Her First Kitchen
First‑time kitchen remodel with accessible layout, slip‑resistant flooring, bright task lighting, and easy‑reach storage.

Craftsman Trim Carpentry Minneapolis
Minneapolis
Historic‑style casing, stair details, and custom millwork matched to Craftsman profiles—precise trim for older Twin Cities homes.

Kim on Drywall Stilts — Woman‑Owned GC
On‑site GC leadership handling punch work, drywall touch‑ups, and schedule coordination—woman‑owned and operated.
We typically book 6–9 months in advance and are currently scheduling into 2026. The prices listed are estimates; actual cost depends on site conditions such as structural work or wall removal, plumbing and electrical moves, condo access rules, and material choices. Ready to plan a basement, attic, or custom project? Request a consult.